background image
Skip to content
Connect
Maps

We offer a variety of map options on the maps.brant.ca site.

Maps Brant You may choose to view a dynamic interactive map system with numerous mapping layers that can be turned on as needed. Or, you may select from maps from the gallery, which have been prepared to promote or highlight locations and specific information across the County of Brant.

Interactive Maps

Gain access to a vast amount of information on this mapping site anytime or anywhere. The mapping solution is widely available on many devices that support web browsing.

Launch the Map App

Map Gallery

View and download maps prepared to promote events, trails and locations across the County.

Full County of Brant Map
View More maps...

Inspections

Required Inspections: House Construction

  1. EXCAVATION: prior to placing concrete - excavation for foundation complete, footing forms in place.
  2. FOUNDATION: prior to backfilling - footings, walls, damp proofing, drainage tile, and stone cover complete.
  3. FRAMING: following electrical and mechanical rough ins - framing, including roofing, windows, doors, and stairs complete.
  4. PLUMBING: rough in - drains and vents, complete, (water or air test).
  5. FIREPLACE/CHIMNEY: commencement of construction - masonry, or factory built.
  6. INSULATION: installation - insulation, vapour barrier, and air barrier complete.
  7. FINAL to permit occupancy:
    • Permit to occupy a partially completed building requires, building is 80% complete, all health and life safety items complete, final electrical inspection by E.S.A., and a $50 fee for a partially complete inspection and certificate.
    • Permit to occupy a completed building requires all building Items complete and submission of grading certificate.

Required Inspections: Septic Systems

The following inspections are required for the construction of an O.B.C. Part 8, Class 4 Sewage System.

  1. CONVENTIONAL INGROUND TRENCH SYSTEM
    • Tank Installation: prior to backfilling septic tank.
    • Leaching Bed Construction: prior to backfilling leaching bed (tile bed) trenches - distribution pipe, clear stone and protective paper or geo-textile fabric in place.
    • Final: following final grading of the leaching bed (tile bed) area.
  2. CONVENTIONAL RAISED BED SYSTEM
    • Tank Installation: prior to backfilling septic tank.
    • Excavation: prior to placing imported leaching bed and mantle fill material - topsoil removed, subgrade graded and scarified.
    • Leaching Bed Construction: prior to backfilling leaching bed (tile bed) trenches -distribution pipe, clear stone and protective paper or geo textile fabric in place.
    • Final: following final grading of the leaching bed (tile bed) and mantle areas.
  3. FILTER BED
    • Tank Installation: prior to backfilling septic tank.
    • Excavation: prior to placing imported filter bed and mantle material - topsoil removed, subgrade graded and scarified.
    • Filter Bed Medium: following placement of required imported filter sand.
    • Filter Bed Construction: prior to backfilling filter bed - distribution pipe, clear stone and protective paper or geo textile fabric in place.
    • Final: following final grading of the filter bed and mantle areas.

Required Inspections: Accessory Buildings

The following inspections are required for accessory buildings, (detached garages, sheds, small pole barns, and decks).

  1. EXCAVATION: before concrete is placed, for foundation, pier or post footings, and concrete slabs.
  2. FRAMING: before windows, doors, interior or exterior finishes are installed.
  3. FINAL INSPECTION: prior to use or occupancy of the building or deck.

Required Inspections: Woodstoves and Factory Built Chimneys

The following inspections are required for the installation of a woodstove or factory build chimney.

  1. COMMENCEMENT TO INSTALL: prior to installation of either a woodstove or a factory built chimney - to discuss, on site, Building Code installation requirements.
  2. FACTORY BUILT CHIMNEY OR WOODSTOVE
    • CHIMNEY INSTALLATION: prior to closing in chimney - installation of ceiling or wall covering materials; or
    • WOODSTOVE INSTALLATION: following installation of woodstove - including installation of smoke alarm and carbon monoxide detector.
  3. FINAL: prior to use of either the woodstove or a factory built chimney, may be combined with one of the above inspections.

 

 

County Contacts

Administration
26 Park Avenue, Burford, ON N0E 1A0
Phone: 519-449-2451
Toll Free: 1-888-250-2295
Fax: 519-449-2454
Monday - Friday - 8:30 a.m. - 4:30 p.m.

County of Brant Offices & Community Centres
are closed Thanksgiving Day Monday October 9, 2017.

Mailing Address
P.O. Box 160
Burford, ON
N0E 1A0

Property Tax
26 Park Avenue, Burford, ON N0E 1A0
Phone: 519-449-2451
Toll Free: 1-888-250-2295
Fax: 519-449-1380
Monday - Friday - 8:30 a.m. - 4:30 p.m.

County of Brant Offices & Community Centres
are closed Civic Day Monday, August 7 2017.

Mailing Address
P.O. Box 249
Burford, ON
N0E 1A0

Full Sitemap