News
Search
Urban Area Yard Waste Collection will take place next week - June 10 to 14
Posted on Thursday, June 06, 2024 02:00 PM
Urban Area Yard Waste Collection will take place next week, June 10-14, 2024
Yard waste curbside collection is offered to residential properties within urban areas. Leaf and Yard Waste is also free for disposal at the Landfill and Transfer Station for residential users.
Set Out Requirements:- Materials are to be set out by 7:00 am on your regular collection day
- Please note that due to the fluctuating volume of yard waste set out for each collection week, collection of material may not occur on your...
King Edward Street Lane Closures
Posted on Thursday, June 06, 2024 12:00 PM
On Friday, June 7 and Monday, June 10, 2024, the intersection of King Edward Street and Dundas Street West in Paris will undergo existing asphalt removal and placement of surface asphalt.
Location: King Edward Street and Dundas Street West intersection
Work Date: Friday June 7 and Monday June 10 2024
Work Preformed by: Sierra Infrastructure Inc. for County of Brant
Reason: Existing asphalt removal and placement of surface asphalt
Note:
- Through traffic will be maintained
- Local access will be maintained
Dundas Street West, Daugaard Avenue, Chapel Street, Main Street Construction 2024 – Lane Closures
Posted on Thursday, June 06, 2024 10:00 AM
Beginning Monday, June 10 until Tuesday, June 11, 2024, Dundas Street West, Daugaard Avenue, Chapel Street, Main Street will be undergoing construction resulting in lane closures.
Locations: Dundas Street West, Daugaard Avenue, Chapel Street, Main Street
Work Dates: Monday, June 10 and Tuesday, June 11, 2024
Work Preformed by: Sierra Infrastructure Inc. for County of Brant
Reason: Surface asphalt paving
Note:
- Through traffic will not be maintained
- Local access will be maintained
- Emergency access will be...
Iarocci Boulevard – New Road Construction, Sanitary Sewer, Watermain, Stormwater Works
Posted on Wednesday, June 05, 2024 05:00 PM
Revised: Beginning May 3, 2024, new road construction will begin on Iarocci Boulevard. Iarocci Boulevard will be closed to through traffic for asphalt resurfacing and new curb and gutter. The closure is expected to last until Friday, June 14, 2024. Full details below:
Iarocci Boulevard – New Road Construction, Sanitary Sewer, Watermain, Stormwater Works
Location: Iarocci Boulevard from Consolidated Drive to Green Lane
Revised Work Dates: Friday, May 3 to Friday, June 14, 2024
Work Performed by:
Crack Sealing Operations 2024
Posted on Wednesday, June 05, 2024 10:00 AM
Crack Sealing Operations in the County of Brant are set to begin Thursday, June 6, 2024 and continue to Friday, July 26, 2024. Below is a complete list of locations:
Burford
- Bishopsgate Road from Golf Links Road to Powerline Road
- Maple Avenue North from Highway #2 to Golf Links Road
- Maple Avenue South from Eighth Concession Road to Ninth Concession Road
- West Quarter Townline Road from Highway #53 to Fourth Concession Road
- Whitehead Street from Smith Street to north end
Cainsville
- Brant County Road #18...
Surface Treatment Replacement or Resurfacing Low Volume Roads to Begin on Thursday, June 6, 2024
Posted on Wednesday, June 05, 2024 09:30 AM
Beginning Thursday, June 6 until Friday August 30, 2024, Surface Treatment Replacement or Resurfacing of Low Volume Roads will be taking place within the County of Brant. A full list of locations can be found below:
Brant School Road
- from West Harris Road to Hammond Road
Hammond Road
- from McBay Road to Brant School Road (2nd Year of 2 Year Program)
East Quarter Townline Road
- from Sixth Concession Road to Fifth Concession Road (1st Year of 2 Year Program)
- from Fifth Concession Road to Golf Links Road...
Garbage & Recycling Collection Delay Notice - Monday, June 3, 2024
Posted on Monday, June 03, 2024 03:00 PM
It is anticipated Garbage and Recycling in some areas of today’s collection will not get picked up by 5:00 pm today. Collection Crews are working diligently and are hopeful to complete collection today.
If your material has not been picked up by 8:00 pm tonight, please either leave your materials curbside overnight, or remove and place it back at curbside by 7:00 am tomorrow morning, and it will be collected by the end of day.
We apologize for any inconvenience and thank you for your patience.
Bishopsgate Road Maintenance Works 2024
Posted on Monday, June 03, 2024 08:16 AM
Bishopsgate Road Maintenance Works 2024
Location: 468 Bishopsgate Road – between Golf Links Road and the Fifth Concession Road
Work Dates: Monday June 3, 2024
Work Preformed by: Pave-Al Limited
Reason: Road maintenance, including milling and repaving
Note:
- Local access will be maintained
- Emergency access will be maintained
- Signage will be posted, and a flag person will direct traffic when required
- Non-local motorists are encouraged to take alternative traffic route
Please refer to Municipal 511 Website for...
PA Day Public Swim
Posted on Sunday, June 02, 2024 12:00 PM
The Paris Community Pool is open! Join us tomorrow for a PA Day Public Swim. Date: Monday, June 3 Time: 9:30 am – 2:30 pm Location: Paris Community Pool (80 Laurel Street, Paris) Fee: 2 years and younger: Free Child/Youth (3 yrs. to 18 yrs.) - $3.25 Adult (19 yrs. To 54 yrs.) - $4.75 Senior (55 yrs. +) – $4.00 Group (max 5 people – min 1 adult, 2 max) - $12.75 For more information on Aquatics in Brant visit brant.ca/Aquatics
Celebrate June in the County of Brant!
Posted on Friday, May 31, 2024 02:10 PM
The County of Brant is delighted to announce a series of exciting events and activities to celebrate the month of June. This month, we honour both Seniors Month and Parks and Recreation Month, offering a wide array of opportunities for residents of all ages to engage, get outdoors, and celebrate our vibrant community.
Key Highlights for June:
- Seniors Month: Join us in celebrating our senior residents with various activities and events tailored to honour their contributions to our community. We...