2024 Sanitary Sewer Maintenance April 15-17 - Paris and St. George

Beginning Monday, April 15, 2024, The County of Brant will be conducting routine maintenance work on the Sanitary Sewer Systems in the following areas:
Paris
- Church Street
- King Edward Street
- Ball Street
- Burwell Street
- Church Street
- Creeden Street
- Dumfries Street
- Grand River Street South
- Main Street
- Queen Street and Washington Street
St. George
- Main Street North
- Main Street South
- Victor Boulevard
The work is scheduled to take place during the day Monday, April 15 to Wednesday, April 17 between the hours of 7:00am and 5:00pm.
This routine maintenance work involves high pressure cleaning of the sanitary sewers in the roadway followed by a video inspection of the pipes. The cleaning activities can result in sufficient back pressure that may cause splashing in some plumbing fixtures and may remove water from the “P” traps in your plumbing fixtures.
We recommend that:
- All toilet seats are left in a closed position during this time.
- You refrain from using toilets when maintenance vehicles are present near your location.
- You run water in all plumbing fixtures (minimum of 5 seconds) when work has been completed to ensure the “P” traps are full.
It is our goal to minimize any inconvenience to our residents. Your patience through any disruption will be greatly appreciated. Once the maintenance vehicles have completed the work in your area, you may resume using your facilities as usual.
If you have any questions or concerns, please contact Wessuc Inc. at 519.752.0789. If Wessuc Inc. is not available, you may contact the County of Brant Environmental Services Division at 1.855.442.7268 or 519.442.7268.
Please refer to Municipal511 website for the most up-to-date information regarding road construction and closures.