Bethel Road Reconstruction 2025
.png)
Please be advised that Bethel Road from Folsetter Drive to Pottruff Road will be closed for Road Reconstruction starting Monday, April 14.
Details
Location: Bethel Road from Folsetter Drive to Pottruff Road
Work Dates: Monday, April 14, to late November 2025
Work Performed by: Regional Sewer and Watermain for County of Brant
Reason: Full road reconstruction including watermain, sanitary sewer and storm sewer, as well as road resurfacing.
Notes:
- Through traffic will not be maintained
- Local access will be maintained
- Emergency access will be maintained
- Signage will be posted, and a flag person will direct traffic when required.
- Properties on Pottruff Road will be accessible from Robinson Road only
- Access to 67 and 68 Bethel Road and 871 Rest Acres Road will be from Rest Acres Road only
- Access to 54, 58, 60 and 66 Bethel Road will initially be from Rest Acres Road but will change as work progresses
- Residents will be notified on changes. Updates on details related to traffic and access will be posted on a regular basis.
Please refer to Municipal 511 http://www.municipal511.ca for the most up-to-date traffic information regarding road construction and closures.
It is our goal to minimize any inconvenience to our residents. Your patience through any disruption will be greatly appreciated. If additional information is required, please contact:
Joe Murphy, C.E.T
Capital Project Manager
519.44BRANT x 2209
joe.murphy@brant.ca