Sanitary Sewer Maintenance in Paris: March 12-14

- Cardinal Lane
- Cobblestone Drive
- Crawford Place
- Grandville Circle
- Irongate Drive
- Marriott Place
- McQueen Drive
- Row Lane
The work is scheduled to take place from Wednesday, March 12 to Friday, March 14, between the hours of 7:00 am to 5:00 pm.
This routine maintenance work involves high pressure cleaning of the sanitary sewers in the roadway followed by a video inspection of the pipes. The cleaning activities can result in sufficient back pressure that may cause splashing in some plumbing fixtures and may remove water from the “P” traps in your plumbing fixtures.
We recommend that:
- All toilet seats are left in a closed position during this time.
- You refrain from using toilets when maintenance vehicles are present near your location.
- You run water in all plumbing fixtures (minimum of 5 seconds) when work has been completed to ensure the “P” traps are full.
Note:
- Through traffic is permitted
It is our goal to minimize any inconvenience to our residents. Your patience through any disruption will be greatly appreciated. Once the maintenance vehicles have completed the work in your area, you may resume using your facilities as usual.
If you have any questions or concerns, please contact Wessuc Inc. at 519.752.0789. If Wessuc Inc. is not available, you may contact the County of Brant Environmental Services Division at 1.855.442.7268 or 519.442.7268.
Please refer to Municipal511 for the most up-to-date information regarding road construction and closures.