The County of Brant is responsible for construction and maintenance of our roads. To build, maintain and repair our roads, sidewalks and other infrastructure, we sometimes need to restrict access to roads.
We make every reasonable effort to notify you about our road closures well in advance of any disruptions, however, all dates are tentative and may change without notice, due to weather conditions, etc.
What to Expect
Road closures for construction projects may delay your trip and affect your residential area in other ways.
You may temporarily lose access to your road for a short period of time.
Unless otherwise notified, continue to place your garbage and recycling out to the curb as usual.
Construction Zone Safety:
Do not enter a work site with "Road Closed" signs to get to your home or work.
Be extra cautious, slow down, vehicles ahead of you could stop suddenly.
Watch for a traffic person directing traffic. They are there to protect both you and the construction workers.
The County of Brant Ontario Provincial Police (OPP) would like to remind motorists about the necessity of being extra cautious while travelling in Construction Zones.
Current Temporary Road Closures and Construction
Road Name |
From/To |
Dates |
Duration |
Reason |
Road Access |
Multiple Streets involved in project. Please see attachment. |
Various | May 24, 2022 to June 24, 2022 | 1 month | Routing and Sealing of Asphalt Cracks | Traffic will be reduced to one lane as cracking sealing is completed |
Alexander Street |
Rutherford Street to Brian Drive |
May 30, 2022 to June 17, 2022 |
3 weeks |
Minor Grading and Sewer Works, Surface Asphalt Paving, Minor Curb work and Topsoil and Sod Restoration |
No through traffic Detour signage will be posted Local access will be maintained Emergency access will be maintained |
Laurel Street |
Dundas Street West to end |
April 27 - June 10, 2022 |
6 weeks |
Minor Grading and Sewer Works, Surface Asphalt Paving and Topsoil and Sod Restoration |
Through traffic will be maintained |
Governors Road East |
St. George Road to Bethel Church Road |
May 4, 2022 through June 17, 2022 |
6 weeks |
McKay Bridge Rehabilitation |
No through traffic Local and Emergency access will be maintained from either side of the bridge Detour signage will be posted |
Rest Acres Road |
Powerline Road to King Edward Street |
April 4, 2022 through May 20, 2022 |
2 months |
Landscaping, Tree and Shrub Planting |
Lane Closures Local traffic will be maintained Emergency access will be maintained |
Burtch Road |
Mt.Pleasant Road to Pleasant Ridge Road |
UPDATE Wednesday March 30, 2022 through Friday June 17, 2022 |
12 weeks |
Storm Sewer Installation and Road Resurfacing |
No through traffic Detour signage will be posted Local access will be maintained Emergency access will not be maintained |
Baptist Church Road |
County Road 22 to Onondaga Townline Road |
September 27, 2021 through December 3, 2021 |
2.5 months |
Bridge Replacement |
No through traffic Local Access will be maintained Emergency Access will be maintained Detour routes will be posted
|
Cedar Street |
Rest Acres Road to King Edward Street |
Monday August 16, 2021 to late December 2021 |
4 months |
Installation of sewer, sidewalk, curbs, gutter and road reconstruction |
No through traffic during working hours 7:00 am to 6:00 pm. Local access only. Emergency access will be maintained.
|
Laurel Street
|
Dundas Street West to Lions Park |
July 22, 2021 through November 2021 | 4.5 months |
Sidewalk Installation Sanitary Sewer & Water Services Installation/Replacement Storm sewer, gutter and curb replacement |
Local and Emergency Access Only Traffic reduced to one (1) lane. Traffic will be flagged through. Expect delays.
|
Salt Springs Church Road |
Between Brant County Road 18 and Hamilton Road |
Wednesday April 7 until further notice | until further notice | Road issue |
No through traffic, local and emergency traffic only
|
Brant Mill Road (Oakland) |
14 Brant Mill Road between Oakland Road and Jenkins Road
|
Friday, October 19, 2018 until further notice |
until further notice |
Brant Mill Bridge structural assessment |
No through traffic. Detour routes will be posted. |
Governors Road West (Paris) |
at Cleaver Road
|
Effective September 30, 2013
|
UPDATE: until 2021 (approx.)
|
Construction |
No through traffic |
Rest Acres Road (Update) |
King Edward Street to Powerline Road |
Ongoing |
Mid- Summer 2021 |
Road Construction |
Local access will be maintained until further notice Emergency vehicle access will be maintained until further notice |
The County inspects and maintains the streets in our community regularly according to the Minimum Maintenance Standards set out by the Province.
If you notice something that may need to be fixed, let us know. We will review and investigate your concern.
Thank-you
Contact Us