The County of Brant is responsible for construction and maintenance of our roads. To build, maintain and repair our roads, sidewalks and other infrastructure, we sometimes need to restrict access to roads.
We make every reasonable effort to notify you about our road closures well in advance of any disruptions, however, all dates are tentative and may change without notice, due to weather conditions, etc.
What to Expect
Road closures for construction projects may delay your trip and affect your residential area in other ways.
You may temporarily lose access to your road for a short period of time.
Unless otherwise notified, continue to place your garbage and recycling out to the curb as usual.
Construction Zone Safety:
Do not enter a work site with "Road Closed" signs to get to your home or work.
Be extra cautious, slow down, vehicles ahead of you could stop suddenly.
Watch for a traffic person directing traffic. They are there to protect both you and the construction workers.
The County of Brant Ontario Provincial Police (OPP) would like to remind motorists about the necessity of being extra cautious while travelling in Construction Zones.
Current Temporary Road Closures and Construction
Road Name |
From/To |
Dates |
Duration |
Reason |
Road Access |
(Paris) |
From William Street to Broadway Street West
|
Thursday, November 28, 2019 |
7:00AM-5:00PM |
Water and sewer service connection |
No through traffic. |
UPDATE 2 (Paris) |
From Mechanic Street to Lions Park |
UPDATE 2 Monday, November 4 to Friday, November 22, 2019
|
UPDATE 2 3 weeks |
Bridge deck repairs |
No Pedestrian traffic. |
(Paris) |
From the east leg of King Edward Street for 220 metres to the west |
Monday, November 18, 2019 to Friday, December 13, 2019 |
4 weeks | Watermain reconstruction |
Local access will be maintained. Emergency vehicle access will be maintained |
Watts Lane (Paris) |
Between Spruce Street and Wellington Street |
Tuesday, November 19, 2019 |
7:00AM - 5:00PM | Construction Bin blocking through traffic. |
Local and EMS access from either Spruce Street or Wellington Street. No through traffic.
|
(Airport) |
Airport Road to Oakhill Drive |
Tuesday, October 29 through Friday, December 13, 2019
|
7 weeks | Watermain reconstruction |
Traffic will be flagged through work zone, as necessary |
Various Streets |
Monday, November 11, 2019
|
1 day | Remembrance Day Ceremonies | No through traffic. Emergency Access only. | |
Bethel Road (Paris) |
Folsetter Drive to 200 m east of Rest Acres Road |
Fall 2019 - Spring 2020 |
9 months | Bethel Road Servicing, water and wastewater |
Lane restrictions when necessary, road closures not anticipated |
UPDATE (Airport) |
Colborne Street West to Airport Road |
UPATE Monday, September 30 to Friday, November 29, 2019
|
UPDATE 8 weeks |
Watermain reconstruction |
Traffic will be flagged through construction. Emergency and local traffic will be maintained.
|
(Paris) |
Rest Acres Road and Powerline Road |
Monday, August 19 to November 30, 2019 |
3 Months |
Construction of underground services and roads for Scenic Ridge Subdivision –Phase 1.
|
See link for more information. |
(Paris) |
Rest Acres Road to 0.5 km to the west on Powerline Road
|
UPDATE This project has been delayed until spring 2020
|
3 months | Addition of multi-use trail, curbs and storm sewer. | No through traffic. Detour routes will be posted. |
(Paris) |
Rest Acres Road and Grandville Circle/Misener Road West | Monday, July 8 to December, 2019 | 5 months |
Replacement of water main, storm sewer, addition of sidewalks and curbs added to the south side of the street.
|
Reduced to one lane during the day and open to two lanes overnight and on weekends. |
(Paris) |
Arlington Meadows Subdivision |
Monday, April 8 to Thursday, October 31, 2019
|
7 months | Sanitary sewers, storm sewers, watermain, curbs and base asphalt | Traffic flagged as required. |
Brant Mill Road (Oakland) |
14 Brant Mill Road between Oakland Road and Jenkins Road
|
Friday, October 19, 2018 until further notice |
until further notice |
Brant Mill Bridge structural assessment |
No through traffic. Detour routes will be posted. |
Governors Road West (Paris) |
at Cleaver Road
|
Effective September 30, 2013 |
UPDATE: until 2020 (approx.)
|
Construction |
No through traffic |
The County inspects and maintains the streets in our community regularly according to the Minimum Maintenance Standards set out by the Province.
If you notice something that may need to be fixed, let us know. We will review and investigate your concern.
Thank-you
Contact Us